Muscle Milk

Vintage Scripto Mechanical Pencil Long Leads 5 Pack E 430HB

Description: Used condition and fast shipping

Price: 9.99 USD

Location: Erie, Pennsylvania

End Time: 2024-09-10T22:08:34.000Z

Shipping Cost: 0 USD

Product Images

Vintage Scripto Mechanical Pencil  Long Leads 5 Pack E 430HBVintage Scripto Mechanical Pencil  Long Leads 5 Pack E 430HBVintage Scripto Mechanical Pencil  Long Leads 5 Pack E 430HBVintage Scripto Mechanical Pencil  Long Leads 5 Pack E 430HB

Item Specifics

Return shipping will be paid by: Seller

All returns accepted: Returns Accepted

Item must be returned within: 30 Days

Refund will be given as: Money Back

Brand: Scripto

Type: Continuous Twist

Lead Diameter: Plastic

Lead Grade: HB

Material: Plastic

Country/Region of Manufacture: United States

Vintage: Yes

Recommended

Vintage USA Made Scripto Mechanical Pencil Teal Color Works Great Very Decent
Vintage USA Made Scripto Mechanical Pencil Teal Color Works Great Very Decent

$14.75

View Details
Vtg RED Translucent Scripto Mechanical Pencil Long Leads Erasers & PEN in Pack
Vtg RED Translucent Scripto Mechanical Pencil Long Leads Erasers & PEN in Pack

$32.99

View Details
Lot of Eight (8) Vintage Scripto 'Property U.S. Government' Mechanical Pencils
Lot of Eight (8) Vintage Scripto 'Property U.S. Government' Mechanical Pencils

$39.99

View Details
Scripto Aim'nFlame II Torch Flame Utility Lighter
Scripto Aim'nFlame II Torch Flame Utility Lighter

$67.10

View Details
SCRIPTO P21 Mechanical Pencil 0.7mm Black Rubber Grip Taiwan Tested Retired
SCRIPTO P21 Mechanical Pencil 0.7mm Black Rubber Grip Taiwan Tested Retired

$19.99

View Details
Vintage1991 Scripto SCOUT Ultra Thin Writing Mechanical Pencil 0.5mm HB Lead
Vintage1991 Scripto SCOUT Ultra Thin Writing Mechanical Pencil 0.5mm HB Lead

$17.99

View Details
Vintage SCRIPTO K780 Translucent Mechanical Pencil Lot
Vintage SCRIPTO K780 Translucent Mechanical Pencil Lot

$24.00

View Details
OG&E Scripto Combination Set Mechanical Pencil Lead With Box Wooden Insert Vtg
OG&E Scripto Combination Set Mechanical Pencil Lead With Box Wooden Insert Vtg

$29.95

View Details
Scripto AIM 'N Flame Multi-Purpose Utility Lighter Random Color 12-lighters
Scripto AIM 'N Flame Multi-Purpose Utility Lighter Random Color 12-lighters

$44.99

View Details
PP1 Scripto Property US Government Mechanical Pencil Red Barrel
PP1 Scripto Property US Government Mechanical Pencil Red Barrel

$8.00

View Details